Houzz Logo Print
Стильный дизайн: огромный двор в современном стиле с местом для костра и покрытием из каменной брусчатки без защиты от солнца - последний тренд

Martis Camp Project

This massive 7-figure project in Martis Camp (Truckee, California) began in April of 2106 when Jon invited a few members of the Throughstone Group to fly there and walk through the site to see what ideas they could collectively form for the client from a "blank slate". A theme was then proposed; a rough plan was approved; and phase one site preparation began that same Fall. It's a one-of-a-kind collaboration involving every member of the Throughstone Group from Colorado, California, Washington and Italy. Phase two began in May of 2017 and finished six months later in November. The final phase will be complete in the early summer of 2018. Jon's stonesmith travel team relocated to Truckee for six months and installed approximately 300 tons of basalt and granite stone. The SB Forge + Iron crew designed and built numerous bronze-plated and bronze-sculpted features. The Seattle Solstice team co-designed and built Jon's sculptures up in Seattle, transported them to the site and flew down to install them. Jay of Stellar Jay Designs built all of the wood works in Durango, Colorado and trucked them up himself to put them all in place. Craig and Mary from NW Outdoor Lighting will complete the lighting system in 2018.
Другие фото в Martis Camp Project

К этому фото не задано ни одного вопроса

Есть вопросы к фото? Спросите у нашего сообщества!
Комментируют пользователи Houzz:
amagoo добавил(а) это в Colorado Build Exterior Materials and colors16 апреля 2024 г.

Fire pit/seating